Aquarius Precast offers encased grate and frame combinations in slabs, designed to fit standard-sized pits for seamless installation and added convenience. Skip the hassle of in-situ casting, which can be time-consuming, and choose our pre-encased solutions to streamline your project.

concrete encased GMS Frame
Encased Covers and Frames

Features & Benefits

  • Time & labour savings: Precast design eliminates the need for on-site concrete work, speeding up installation
  • Immediate load bearing: Ready to withstand traffic loads upon installation
  • Durable & long-lasting: High-quality raw materials provide superior longevity over in-situ methods
  • Flat, level surface: Ideal for applications requiring a smooth, standard grey concrete finish
  • Compliant grates & covers: Manufactured to AS3996 standards with Class B & D load-tested options
  • Safety & security: Hinged and bolt-down grates ensure secure access
  • Slip-resistant finish: Broom-finished concrete on infill covers enhances safety and aesthetics
Testimonials

Hear it from
our Clients

quote.svg
1 /

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!