Concrete Pit Covers and Grates

Infrastructure

Concrete Pit Covers and Grates

Aquarius Precast Concrete Pit Covers and Grates are engineered for strength, durability, and versatility. Designed to meet industry standards, they provide secure and reliable access to underground infrastructure, making them suitable for a variety of applications, including stormwater systems, sewer systems, and utility pits.

With their robust construction and ability to withstand heavy loads, our cast iron covers and frames are a trusted solution for both residential and commercial projects.

cast iron covers and frames
Electrical kelly pits
V Drain Drop In Grate 1
CONCRETE ENCASED CAST IRON INFILL COVERS
concrete pits

Optional Video Section

Testimonials

Hear it from
our Clients

quote.svg
1 /

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure