Cast iron Covers & Frames

Infrastructure

Cast Iron covers and Frames

Aquarius Precast Cast Iron Covers and Frames are engineered for strength, durability, and versatility. Designed to meet industry standards, they provide secure and reliable access to underground infrastructure, making them suitable for a variety of infrastructure applications.

With their robust construction and ability to withstand heavy loads, our cast iron covers and frames are a trusted solution for both residential and commercial projects.

Cast iron covers and frames
cast iron covers and frames
Cast iron Covers & Frames

Benefits

  • Engineered to Standards: Compliant with Energex and Ergon Energy requirements for electrical transformer installations.
  • Removable End Panels: Sealed and bolted knock-out panels allow for easy access during installation and maintenance.
  • Heavy-Duty Construction: With a mass of 1,594kg, it provides a stable and secure platform.
  • Optional Base Slab: Enhances stability in unstable ground conditions, ensuring a level foundation.
  • High-Quality Finish: Precision manufacturing delivers a smooth, durable surface for long-term performance.
concrete pits

Optional Video Section

Testimonials

Hear it from
our Clients

quote.svg
1 /

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure