Aquarius Precast have a large range of robustly designed sump, dome and gully grates for drop into Aquarius Precast pit rebates or in frames for casting into pit roof slabs in-situ. Includes cast iron covers and frames
and V Drain Drop In Grate 1.
Engineered to Standards: Compliant with Energex and Ergon Energy requirements for electrical transformer installations.
Removable End Panels: Sealed and bolted knock-out panels allow for easy access during installation and maintenance.
Heavy-Duty Construction: With a mass of 1,594kg, it provides a stable and secure platform.
Optional Base Slab: Enhances stability in unstable ground conditions, ensuring a level foundation.
High-Quality Finish: Precision manufacturing delivers a smooth, durable surface for long-term performance.
concrete pits
Optional Video Section
Testimonials
Hear it from our Clients
1 /
Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!
Lewis Hayes – Project Engineer at Pensar Infrastructure
Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!
Lewis Hayes – Project Engineer at Pensar Infrastructure
Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!
Lewis Hayes – Project Engineer at Pensar Infrastructure
Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!
Lewis Hayes – Project Engineer at Pensar Infrastructure