Stormwater Access Chambers

Plumbing and Drainage

Stormwater Access Chambers

Aquarius Precast Stormwater Access Chambers provide easy access for maintenance and inspections of stormwater systems. Made from durable precast concrete, they are built to withstand various conditions and ensure long-lasting performance. Available in multiple sizes, these chambers are ideal for both residential and commercial applications.

Stormwater access chambers
Stormwater Access Chambers

Benefits

  • Precast: eliminating the need for onsite moulds and concrete pouring.
  • 1050 diameter – Also 600mm x 600mm, 600mm x 900mm and 900mm x 900mm.
  • Cast in cast iron or grates.
  • Variety of cover options.
  • All council and Water Authority options available.
Testimonials

Hear it from
our Clients

quote.svg
1 /

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure