Thin Wall Concrete Pits – Plumbing and Drainage

Features & Benefits

  • Drop In Grate
  • Concrete Classic Lid
  • Drop In Checker Plate Lid
  • Aluminum Access Cover – Light and Very Cost Effective
  • Checker Plate Covers Hinged
  • 1000 & 1200 Pit Range – Heavy Duty Covers
  • 450 & 600 Pit Range Can Be Manually Handled
  • Light
  • Easy Transport
  • Flexible For Small Sites
  • Quick & Easy Installation
  • Maximum installation depth 3.2m
Testimonials

Hear it from
our Clients

quote.svg
1 /

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!

Lewis Hayes – Project Engineer at Pensar Infrastructure