Screenshot 2024 08 20 At 16.00.51 1 (1)
Projects

Project Name Goes Here

Lorem ipsum dolor sit amet consectetur adipis tempor inicidiunf aul labore eet dolore magna

client
Yurika
Industry
Renewable Energy
location
MacIntyre Wind Farm
Product
Substation pits
Construction and development

Our Client Objetive

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Screenshot 2024 08 20 At 16.51.01 1
Screenshot 2024 08 20 At 16.51.50 1
Construction and development

Our Solution

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

  • Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi
  • Aliquip ex ea commodo consequat.
  • Duis aute irure dolor in reprehenderit in voluptate velit esse cillum
  • Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Yurika Acciona

PROJECTS

15110279 1815928271986954 2820516080829323828 O 2 (3)
15110279 1815928271986954 2820516080829323828 O 2 (2)
15110279 1815928271986954 2820516080829323828 O 2 (1)
15110279 1815928271986954 2820516080829323828 O 2
15110279 1815928271986954 2820516080829323828 O 1
15110279 1815928271986954 2820516080829323828 O 2 (3)
15110279 1815928271986954 2820516080829323828 O 2 (2)
15110279 1815928271986954 2820516080829323828 O 2 (1)
15110279 1815928271986954 2820516080829323828 O 2
15110279 1815928271986954 2820516080829323828 O 1
Yurika acciona

The Solution

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Concrete Pits

Optional Video Section

Proud to be involved in the design, procurement, planning, installation & commissioning of another complex water infrastructure project.
With only 36 hours to complete the works and get the water back on line, was great to finish with 5 hours up our sleeve.
Shoutout to the Aquarius Precast team, successfully fabricating two precast flow meter pits with all pipework cast insitu (on grade) for the first time.
On to the next one!
Lewis Hayes – Project Engineer at Pensar Infrastructure